HAIRF Module Data Center

Hairf Modular Date Center also knows as “HMDC”, according to the global trend of cloud computing and development needs adhering to the efficient modular construction concept the integration of Internet based on traditional modular digital technology. HMDC is a smart and flexible architecture suitable for small and medium enterprise applications. In addition to the integration of main systems of power, cooling, racks and monitoring, the cold or hot aisle containment also provides superior air flow management to enhance cooling efficiency. A traditional datacenter takes 18 to 24 months to build, while a modular datacenter requires only a few weeks or months for deployment. Hairf modular datacenter, with its fully modular design concept, is flexible and offers pay-as-you-grow with short installation time to meet the rapidly growing needs of data storage and processing.

234 people are viewing this right now

Description

 

Model

HMDC-0803

HMDC-0805

HMDC-0808

HMDC-1603

HMDC-1605

HMDC-1608

HMDC-2403

HMDC-2405

HMDC-2408

Cabinet subsystem

Dimension

W*D*H:600*1100*2000mm,Other sizes can be customized

Quantity

8 units

16 units

24 units

Cabinet Power density

3kw/rack

3kw/rack

8kw/rack

3kw/rack

5kw/rack

8kw/rack

3kw/rack

5kw/rack

8kw/rack

Cabinet Total power

24KW

40KW

64KW

48KW

80KW

128KW

72KW

120KW

192KW

Cabinet power supply

Dual PDU power supply

Distribution subsystem

Power supply

2N power supply,Tier I grade

Column counter

Precision column cabinet: double loop power supply

UPS

Modular UPS

Model

X7-50

X7-75

X7-100

X7-75

X7-100

X7-150

X7-100

X7-150

X7-250

Capacity

50kVA

75kVA

100kVA

75kVA

100kVA

150kVA

100nVA

150kVA

250nVA

Configuration

2 sets

2 sets

2 sets

2 sets

2 sets

2 sets

2 sets

2 sets

2 sets

Redundant architecture

2(N+1)

2(N+1)

2(N+1)

2(N+1)

2(N+1)

2(N+1)

2(N+1)

2(N+1)

2(N+2)

Refrigeration subsystem

PAC

In-row air conditioner

Model

R261A

R401A

R261A

R161A

R261A

R261A

R261A

R261A

R401A

Air supply

Horizontal air supply

Cooling method

Air-cooled/water-cooed/chilled water

Cooling capacity

25.5kW

41.5KW

25.5KW

15.5KW

25.5KW

25.5KW

25.5KW

25.5KW

41.5KW

Configuration

2 pcs

2 pcs

4 pcs

4 pcs

4 pcs

6 pcs

4 pcs

6 pcs

6 pcs

Redundant architecture

1+1 redundancy

1+1 redundancy

3+1 redundancy

3+1 redundancy

3+1 redundancy

5+1 redundancy

3+1 redundancy

5+1 redundancy

5+1 redundancy

Monitoring subsystem

Terminal interface

21 inch human touch screen

UPS monitoring

Support

Battery Online monitoring

Support(optional)

Power distribution monitoring

Support

PAC monitoring

Support

Leakage monitoring

Support

Temperature and humidity monitoring

Support

Smoke monitoring

Support,Credit card/password/fingerprint(optional)

CCTV

Support

Access control

Support

   System status

Size*W

5.1*3.4m

5.4*3.4m

5.4*3.4m

7.8*3.4m

7.8*3.4m

8.1*3.4m

10.2*3.4m

10.5*3.4m

12*3.4m

Area

17.34m2

18.36m2

18.36m2

26.52m2

26.52m2

27.54m2

34.68m2

35.7m2

40.8m2

Hairf

Hairf has over 30 years of experience working within server rooms and data centre environments across a range of vertical markets. Our knowledge and experience mean that we know how to supply, install and maintain the right power, cooling, monitoring and security solutions for any critical IT systems. As a leading chinese manufacturer of protected server environments, Hairf engineers, international sales and service team, are distributed all around the world in Mexico, Russia, Pakistan, Algeria, Indonesia, China, Philippines, Singapore, Kazakhstan, to ensure we can provide 24 hours service to more than fifty countries. No matter at what level you engage with our organization, be it a project or online purchase, you can rest assured that you will get the right solution for your server room. No matter what your environment be it hospitality or retail, industrial or manufacturing, telecoms or datacentre we know how to create or improve secure, energy efficient and sustainable environments for servers and IT networks.
Select the fields to be shown. Others will be hidden. Drag and drop to rearrange the order.
  • Image
  • Rating
  • Description
  • Add to enquiry
Click outside to hide the comparison bar
Compare